燃?xì)獍l(fā)電機(jī)啟停作業(yè)有很多要注意的地方,下面沼氣脫硫設(shè)備廠家就給大家總結(jié)了一下,希望大家都可以認(rèn)真閱讀,對(duì)大家有所幫助!
Gas generator start-up and shut-down operation has a lot to pay attention to, below the methane desulfurization equipment manufacturers to summarize for you, I hope you can read carefully, to help you!
一、準(zhǔn)備工作
I. Preparations
1、檢查燃?xì)獍l(fā)電機(jī)的預(yù)熱系統(tǒng)、水循環(huán)系統(tǒng)是否正常;
1. Check whether the preheating system and water circulation system of gas generator are normal.
2、檢查氣路上各閥門的狀態(tài),檢查發(fā)電機(jī)通負(fù)載電路開關(guān)狀態(tài);
2. Check the status of the valves on the gas path and the on-off status of the load circuit of the generator.
3、檢查發(fā)電機(jī)組是否固定牢固,各個(gè)電線接頭有無脫落。
3. Check whether the generator set is fixed firmly and whether the connection of each wire has fallen off.
4、檢查機(jī)組機(jī)油,冷卻水、電池液是否足夠,有無滲漏;
4. Check whether the oil, cooling water and battery liquid are enough and whether there is leakage.
5、檢查顯示屏上電池電壓,有無故障報(bào)警,若當(dāng)前有故障報(bào)警,故障后,取消報(bào)警,否則發(fā)電機(jī)無法啟動(dòng);
5. Check the battery voltage on the display screen and alarm if there is a fault. If there is a fault alarm at present, after eliminating the fault, cancel the alarm, otherwise the generator can not start.
二、操作要求
II. Operational requirements
1、熟悉發(fā)電機(jī)操作步驟,嚴(yán)格執(zhí)行本作業(yè)指導(dǎo)卡;
1. Familiar with generator operation procedures, strictly implement the operation guidance card;
2、啟動(dòng)后必須定時(shí)觀測(cè)機(jī)組工作狀況。
2. The working condition of the unit must be observed regularly after start-up.
三、操作步驟
III. Operational steps
㈠ 啟動(dòng)燃?xì)獍l(fā)電機(jī)
A Start-up Gas Generator
1、打開氣路上所有閥門,調(diào)整進(jìn)發(fā)電機(jī)天然氣壓力15mbar(1.5KPa)左右;
1. Open all valves on the gas path and adjust the natural gas pressure into the generator to about 15 bar (1.5 KPa);
2、旋轉(zhuǎn)控制面板上按鈕“啟動(dòng)”位置,啟動(dòng)發(fā)電機(jī);
2. Rotate the button on the control panel to the "start" position and start the generator.
3、機(jī)組啟動(dòng)后檢查各參數(shù)顯示是否正常(電壓、頻率、水溫、油壓等),機(jī)組各部分有無滲漏;
3. Check whether the parameters of the unit are normal (voltage, frequency, water temperature, oil pressure, etc.) and whether there is leakage in each part of the unit after start-up.
4、閉合機(jī)組輸電開關(guān),給負(fù)載供電;
4. Close the transmission switch of the unit to supply power to the load.
5、每30分鐘,記錄運(yùn)行參數(shù)(水溫、油壓、電壓、電流等)。
5. Record operation parameters (water temperature, oil pressure, voltage, current, etc.) every 30 minutes.
㈡ 停燃?xì)獍l(fā)電機(jī)
Gas Generator with Two Stops
1、斷開發(fā)電機(jī)的負(fù)載開關(guān),使機(jī)組空載運(yùn)行5分鐘;
1. Disconnect the load switch of the generator to make the unit run for 5 minutes without load.
2、旋轉(zhuǎn)控制面板上按鈕“停機(jī)”位置。
2. Rotate the button on the control panel to the stop position.
Well, today's wonderful content is introduced here. If you have any questions, please consult the official website customer service staff of biogas desulfurization equipment: http://www.mimi5.cn.